Study notes
No notes have been generated for this topic yet. Open the topic page online and click Generate notes first.
Past exam questions (1)
2018 · Paper 1 · Q2(a) · p.5
The Mary McAleese Boyne Valley Bridge on the M1 motorway uses steel cables in tension to suspend the bridge. [Image: The Mary McAleese Boyne Valley Bridge.]
Marking scheme
Part 5: Marking Out (4 marks), Ø8.1 mm Hole (1 mark), External Profile (5 marks). Total: 10 marks. Part 11: Marking Out (2 marks), 2 x 6 mm Slots (2 marks), 2x M5 Holes (2 marks), 10 mm Radii and Chamfers (4 marks). Total: 10 marks. Total for Section 2: 20 marks.