Study notes
No notes have been generated for this topic yet. Open the topic page online and click Generate notes first.
Past exam questions (3)
2020 · Paper 1 · Q4(c) · p.3
Using notes and a freehand sketch, show one other method of sorting and storing waste materials on a construction site. [Image: A sketch of a construction site with waste bins for sorting materials.]
Marking scheme
Method note + sketch (6 + 10 marks) (16 marks) Sub-total 16 marks Total 50 marks
2020 · Paper 1 · Q4(b) · p.3
Name two construction materials that could be recycled and then re-used on a construction site. Give one suitable re-use for each material. [Image: A sketch of a construction site with waste bins for sorting materials.]
Marking scheme
Construction material 1 (4 marks) Construction material 2 (4 marks) Suitable re-use for material 1 (5 marks) Suitable re-use for material 2 (5 marks) Sub-total 18 marks
2017 · Paper 1 · Q4(a) · p.3
The sketch shows waste materials from a house under repair. To improve waste management, this waste needs to be sorted and stored on-site for reuse. [Image: A sketch of construction waste materials including timber offcuts, plasterboard, bricks, and rubble.] Using notes and freehand sketches, show how to properly sort and store this waste.
Marking scheme
Show how to properly sort and store waste on-site for reuse - Sketches. Valid details: 4 marks. Quality of sketches (excellent, good, fair): 8, 6, 4 marks. Show how to properly sort and store waste on-site for reuse - Notes. Valid detail one: 6 marks. Valid detail two: 6 marks.