2023 · Paper 1 · Q1(b) · p.2
On your drawing, show the typical design detailing to connect the inner and outer leaves of the external wall. [Visual aid: Sketch of external wall and timber first floor of a dwelling house.]
Marking scheme
Wall tie clearly identified (3 marks) (Sub-total 3 marks)
2022 · Paper 1 · Q1(b) · p.2
On your drawing, show the typical design detailing to ensure that the cavity is closed at the door head. [Visual aid: Diagram: vertical section of a dwelling house wall with doorframe and lintels.]
Marking scheme
Cavity closer (3 marks) Sub-total (3 marks)
2022 · Paper 1 · Q1(a) · p.2
To a scale of 1:5, draw a vertical section through the external wall, concrete lintels, doorframe and door. On your drawing show the typical construction details from 400 mm below to a level 400 mm above the concrete lintels. Include four typical dimensions. [Visual aid: Diagram: vertical section of a dwelling house wall with doorframe and lintels.]
Marking scheme
Concrete block inner leaf with 15 mm internal plaster (5 marks) Full fill cavity insulation 200 mm (5 marks) Concrete block outer leaf with 19 mm render (5 marks) Wall ties (5 marks) Concrete lintels (5 marks) Stepped DPC (5 marks) Airtight tape (5 marks) Cavity closer (5 marks) Thermally broken door frame (5 marks) Insulated external door (5 marks) Any 7 x 5 marks (35 marks) Any 4 typical dimensions (4 marks) Draughting, accuracy and scale (excellent, good, fair) (8, 6, 4 marks) (12 marks) Sub-total (35 + 12 = 47 marks)
2019 · Paper 1 · Q1(b) · p.2
Show clearly on your drawing the typical design detailing to ensure that the cavity is closed at the window head. [Diagram: A cross-section of a wall with a window frame and lintel.]
Marking scheme
Cavity closer detail (3 marks) Draughting, accuracy and scale (excellent, good, fair) (8, 6, 4 marks) Sub-total 11 marks Total 50 marks
2019 · Paper 1 · Q1(a) · p.2
To a scale of 1:5, draw a vertical section through the top portion of the window. Show the wall, the concrete lintels and the fixed frame of the window. On your drawing, show the typical construction details from a level 300 mm below to a level 400 mm above the concrete lintels. Include four typical dimensions. [Diagram: A cross-section of a wall with a window frame and lintel.]
Marking scheme
External plaster 19 mm (5 marks) Concrete block outer leaf 100 mm (5 marks) Thermal insulation 200 mm (5 marks) Stepped DPC/ Cavity tie (5 marks) Concrete block inner leaf 100 mm (5 marks) Internal plaster 15 mm (5 marks) Pre-stressed concrete lintels 100 × 70 mm (5 marks) Window head 150 × 80 mm (5 marks) Triple glazing low e glass (5 marks) Any 7 of the above details (5 marks each) Sub-total 35 marks Any 4 typical dimensions (4 marks) Sub-total 39 marks
2019 · Paper 1 · Q4(b) · p.3
Using notes and freehand sketches, show one method of connecting the inner and outer leaves of the wall. [Diagram: A cross-section of a strip foundation supporting a concrete block wall.]
Marking scheme
Method of connecting inner and outer leafs (4 marks) Quality of sketches (excellent, good, fair) (6, 4, 2 marks) Sub-total 10 marks