Study notes
No notes have been generated for this topic yet. Open the topic page online and click Generate notes first.
Past exam questions (1)
2018 · Paper 1 · Q9(a) · p.4
Show, using notes and freehand sketches, how the blockwork over the opening is typically supported. [Visual aid: Diagram: opening in a concrete block wall between two rooms]
Marking scheme
Show how the blockwork over the opening is typically supported - Notes and sketches Valid detail one (4 marks) Valid detail two (4 marks) Quality of sketches (excellent, good, fair) (6, 4, 2 marks)