Study notes
No notes have been generated for this topic yet. Open the topic page online and click Generate notes first.
Past exam questions (2)
2026 · Paper 1 · Q9(a) · p.6
Using notes and freehand sketches, show best practice design detailing that will prevent the formation of a thermal bridge at any three locations circled on the drawing. [Visual aid: Diagram: vertical section through the external leaf of a bungalow showing a concrete block wall with insulated cavity, truss roof, insulated ground floor, and thermally broken window frame. Three locations are circled.]
Marking scheme
Best practice design detailing to prevent thermal bridging: Area 1: Note (8 marks); Sketches (8 marks). Area 2: Note (8 marks); Sketches (8 marks). Area 3: Note (8 marks); Sketches (8 marks).
2019 · Paper 1 · Q9(a) · p.6
Using notes and freehand sketches, show best practice design detailing that will prevent the formation of a thermal bridge at each location circled on the drawing. [Visual aid: Diagram: outline section through the external door of a single-storey house showing circled areas indicating potential thermal bridges.]
Marking scheme
Best practice design detailing to prevent thermal bridging. Wallplate position detail: Notes (8 marks), Sketches (8 marks). Head of door detail: Notes (8 marks), Sketches (8 marks). Threshold of door detail: Notes (8 marks), Sketches (8 marks). Total (6 x 8 marks).