Study notes
No notes have been generated for this topic yet. Open the topic page online and click Generate notes first.
Past exam questions (1)
2026 · Paper 1 · Q8(c) · p.6
Using notes and freehand sketches, outline one design detail in above-ground pipework that will prevent foul odours entering a dwelling. [Visual aid: Diagram: illustration of a bathroom on the first floor of a dwelling house.]
Marking scheme
Design detailing to prevent foul odours entering the building: Design Detailing: Notes (6 marks); Sketches (6 marks).