Study notes
No notes have been generated for this topic yet. Open the topic page online and click Generate notes first.
Past exam questions (4)
2026 · Paper 1 · Q1(b) · p.2
On your drawing, show the typical design detailing that will ensure airtightness at the junction of the ceiling and the external wall. [Visual aid: Diagram: sketch of a dwelling house with a traditional slated cut roof.]
Marking scheme
Design detailing identified to ensure airtightness at the junction of the ceiling and the external wall. (4 marks)
2024 · Paper 1 · Q7(b) · p.5
On your drawing, indicate the typical design detailing to ensure airtightness at the junction of the first floor joist and timber frame inner leaf. [Diagram: A window fitted in the external wall of a two-storey dwelling house. Wall is timber frame construction with external rendered concrete block leaf. Internal timber frame leaf, service cavity, first floor joists, OSB deck, wooden joists, and plasterboard ceiling are shown.]
Marking scheme
Design detail (4 marks). [Diagram showing typical design detailing for airtightness at the junction of the wall and joist, with labels indicating airtightness barrier and tape.]
2018 · Paper 1 · Q7(b) · p.5
Show clearly on your drawing best-practice design detailing to ensure airtightness at the junction of the external wall and the first floor. [Visual aid: Diagram: Outline drawing showing a section of an external wall, doorframe, door, and first floor joists.]
Marking scheme
Best practice design detailing to ensure airtightness: Design detail (4 marks).
2014 · Paper 1 · Q1(b) · p.2
Indicate clearly the design detailing to ensure airtightness at the junction of the ceiling and the external wall. [Visual aid: Sketch of a roof section with labels]